aaa成人,欧美黑人xxxx猛性大交,致命弯道2在线观看免费完整版在线,亚洲情侣视频,91成人在线网站,色戒完整版免费观看无删减版,99综合网

軟題庫(kù) 學(xué)習(xí)課程
當(dāng)前位置:信管網(wǎng) >> 在線(xiàn)考試中心 >> 試題查看
試題題型【多選題】
試題內(nèi)容

 The analysis phase answers the questions of who will use the system, what the system .will do, and where and when it will be used. During this phase, the project team ivetigatesany current system, identifies . (71) and develops a concept for the new system. This phasehas three steps: first, . (72) is developed to guide the project team's efors. It usuallyincludes an analysis of the current system and its problems, and the ways to design a newsystem. The nextstep is _(73)_ . The analysis of this information in conjunction with inputfrom the project sponsor and many other people . leads to the development of a concept for anew system. The system concept is then used as a basis to develop a set of business analysismodels that describes how the business will operate if the new system were developed. The setof models typically includes models that represent the  (74)necessary to support theunderlying business process. Last, the analyses, system concepts, and models are combinedinto a document called the (75) , which is presented to the project sponsor and other keydecision makers that decide whether the project should continue to move forward.
(71) A. improvement opportunities  B. logical model
C. system repuirements        D. system architecture
(72)A.a(chǎn) user manual           B.a(chǎn)n analysis strategy
C.a(chǎn)n analysis use case    D.a(chǎn) design user case
(73)A. project scope definition    B.problems analysis
C.decision analysis            D.requirements gathering
(74)A.data and processes     B.system infrastructures
C.external agents        D.system. software
(75)A.requirements statement    B.design specification
C.system proposal           D.project charter


查看答案

相關(guān)試題



更多試題